Brad has been going crazy over the UV’s. After finishing the modelling process for the mech, I left Brad on his own to do the UV’s so I could start rigging the Mech. I feel kinda guilty that I couldn’t help him with them but I had to get the rig out so James can start animating it. I also had to get back to rigging the Hexalum beast as that hadn’t been touched for almost 2 weeks due to the modelling of the mech.
Brad’s text sheet of 32 udims…
So the plan was to receive the new Hexalum re-topo’d and re-posed geometry on Saturday morning and to start the rigging from scratch as the previous proxy rigs joints I felt were positioned a little too ‘tight’. However, I wasn’t able to obtain this until after lunch today and was stressing about keeping to our schedule of having all rigging done by Monday. Yep.. we have finally fallen behind schedule… officially.